Roof Damp Flashings 2

Renew Flashing

Take out the defective to and rake out joints of brickwork to a suitable depth and replace with new stepped lead cover flashings in code 4 lead wedged and pointed in cement/sand (1:3) mortar finished with joints struck flush.


Roof Damp Flashings 2
https://plumobsidian.github.io/p/5bc8a44c12ff494d9b1e01d12c7723da/
Author
Mr Bog
Posted on
November 5, 2023
Licensed under