Paintwork Lead Re-paint
Where Lead Based Paintwork Present however is in good / sound condition
Using proper and appropriate personal protection as necessary undertake re-decoration by painting over the existing paintwork of the following surfaces to the location(s) stated below: e.g.
- All skirting boards to the 1st floor rear left bedsitting room 3c. (24 linear meters.)
- All wall surfaces to the 1st floor rear right shared kitchen. (approximately 36sqm)
Relocate where necessary the occupiers personal possessions and provide all necessary protection to adjacent areas.
Properly re-paint all stated surfaces using proprietary paint applying primer, undercoat and final finish coats as necessary. Upon completion make good any works disturbed.
Works to be carried out to comply with the Control of Lead at Work Regulations 2002 (as amended).
Paintwork Lead Re-paint
https://plumobsidian.github.io/p/d436c216de364bcfa23a7ff15fa0563f/