Ask Chadwick
  • Home
  • Archives
  • Categories
  • Tags
  • About
  • contact
  • Links

Provide Bathroom Complete

Provide Bathroom complete Construct, or otherwise provide a bathroom comprising a bath (or shower) and wash hand basin complete with adequate supplies of hot and cold water in the XXX, each properly c
2022-10-25
Standard Clauses For Housing Act Use - HHSRS > 17 - Personal Hygiene, Sanitation and Drainage
#personal_hygeine_sanitation_and_drainage

WC Suite

WC suite Provide in the XXX bathroom, a suitable water closet comprising pan and flushing cistern connected to the water supply and drainage system all to approval of respective Local Authorities. Con
2022-07-11
Standard Clauses For Housing Act Use - HHSRS > 17 - Personal Hygiene, Sanitation and Drainage
#personal_hygeine_sanitation_and_drainage

Kitchen

Take a look at Food Safety hazards clauses I have here too as many of them cross over with DH,P&R.
2022-06-28
Standard Clauses For Housing Act Use - HHSRS > 15 - Domestic Hygiene, Pests and Refuse
#domestic_hygeine_pests_and_refuse

Provide handrails to stairs

Provide handrails to stairs Provide and securely install a suitable handrail beside each staircase flight, which is not already provided with a handrail. Each new handrail to be positioned at a height
2021-10-05
Standard Clauses For Housing Act Use - HHSRS > 24 - Fire Safety
#fire_safety

Examine & upgrade existing door frames and install new 30 minute fire door

Examine & upgrade existing door frames and install new 30 minute fire door Remove and suitably dispose of the following doors: - - Remove the architraves from the room-side of the door openings an
2021-10-05
Standard Clauses For Housing Act Use - HHSRS > 24 - Fire Safety
#fire_safety

Replace existing 30 minute door and frame

Replace existing 30 minute door and frame Remove the existing door and frame # specify exact position # and suitably dispose of them. Take care to endure that the door does not contain any asbestos ma
2021-05-17
Standard Clauses For Housing Act Use - HHSRS > 24 - Fire Safety
#fire_safety

Seal doorway (Remove door and seal opening)

Seal doorway (Remove door and seal opening) Remove the existing door and frame. # specify exact position # Seal opening by means of fire resisting construction having a minimum fire resistance of 30 m
2021-03-10
Standard Clauses For Housing Act Use - HHSRS > 24 - Fire Safety
#fire_safety

Provide lobbies outside individual rooms

Provide lobbies outside individual rooms Provide the following rooms …., with fire protecting lobbies of minimum standard of fire resistance of 30 minutes. The lobbies are to be constructed outside th
2021-03-10
Standard Clauses For Housing Act Use - HHSRS > 24 - Fire Safety
#fire_safety

PARTITION (make up single partition to 60 minutes)(high risk areas)

PARTITION (make up single partition to 60 minutes)(high risk areas) Make up to a standard of fire resistance of at least 60 minutes the partition # specify position #. The protection is to be provided
2021-03-10
Standard Clauses For Housing Act Use - HHSRS > 24 - Fire Safety
#fire_safety

AFD For Specific Property Types

To be re-written in accordance to current guidance
2020-05-11
Standard Clauses For Housing Act Use - HHSRS > 24 - Fire Safety
#fire_safety
1…1314151617…25

Search

Hexo Fluid