76 posts in total
2023
Glazing in partition (replace upgrade)
Change catches locks to door
Inner Room new kitchen layout
SOFFIT (Take down and renew to 30 minutes)
Habitable Basements
2021
Provide handrails to stairs
Examine & upgrade existing door frames and install new 30 minute fire door
Replace existing 30 minute door and frame
Seal doorway (Remove door and seal opening)
Provide lobbies outside individual rooms